Sao Nicolau Domestic Airport Terminal
ACS Modular delivered a fully turnkey modular airport terminal for São Nicolau Island, Cabo Verde, providing a fast, cost-effective solution for passenger operations in a remote location. Using off-site modular construction, the modern terminal was delivered rapidly while reducing costs and on-site complexity.
Project Overview
ACS Modular was appointed to design, manufacture and deliver a fully modular domestic airport terminal for Sao Nicolau Island in Cabo Verde. The project required a cost-effective, rapidly deployable solution capable of supporting inter-island passenger operations in a remote location where infrastructure and logistics can present significant challenges.
The completed facility provides a modern terminal capable of supporting passenger volumes of up to 750,000 passengers per year, delivering a long-term infrastructure solution for the island.
The Challenge
Sao Nicolau is a remote island located off the west coast of Africa, where reliable infrastructure and supply chains can present logistical challenges.
The airport operator required a fully operational terminal building delivered quickly and cost-effectively, while ensuring the facility would meet long-term operational requirements for passenger processing.
Key challenges included:
- Remote island location and complex logistics
- Requirement for a fully turnkey solution
- Maintaining strict cost controls for a regional airport project
- Delivering modern airport infrastructure with limited local support systems
The ACS Solution
ACS Modular utilised its modular design and manufacturing expertise to develop a 40m x 20m modular terminal building, manufactured off-site before delivery to the island. By manufacturing the facility off-site, ACS was able to significantly reduce construction time and minimise on-site complexity.
The solution included:
- Full terminal building design and modular manufacture
- Off-site fabrication and integration of terminal systems
- Foundation design with delivery by a local contractor
- Complete turnkey project management from design through installation
Delivery
Close project management and detailed planning allowed ACS to coordinate logistics, manufacturing and on-site installation efficiently despite the remote location.
Once the modules arrived on site, installation progressed rapidly and the terminal was delivered as a fully operational facility within just six weeks from arrival.
Key delivery highlights:
- Modular manufacture and system integration off-site
- Coordinated logistics to remote island location
- Installation and commissioning completed in six weeks
- Full turnkey delivery to the airport operator
Outcome
The project delivered a modern, reliable airport terminal that provides long-term passenger infrastructure for the island. The modular approach enabled the airport operator to deliver a state-of-the-art facility at a fraction of the cost and time of conventional construction, ensuring the project’s viability.
Key outcomes included:
- Rapid deployment of new airport infrastructure
- A modern terminal designed to operate for 40+ years
- Significant cost savings compared with traditional construction
- Expanded passenger capacity for regional air services
Key Project Facts
Location
Sao Nicolau Island, Cabo Verde
Building Size
40m x 20m
Facility
Modular Domestic Airport Terminal
Programme
Delivered within 6 months
Installation
Operational within 6 weeks on site
Delivery
Full turnkey modular solution
What Our Clients Say
Transform Your Airport Infrastructure
Let ACS build what’s next.
Partner with ACS Modular for faster, smarter delivery without compromise.
Get in touch and accelerate your project today.
">