Baggage Facility
ACS Modular delivered a 120m x 40m baggage handling facility at Heathrow Terminal 5C North using modular BaggageBoX systems, enabling rapid delivery and enhanced screening capacity within a live airside environment.
Project Overview
Baggage Reconciliation Facility (T5C North)
ACS Modular delivered a 120m x 40m stand-alone baggage handling facility at Heathrow Terminal 5 to support hold baggage screening operations.
The project was delivered within an exceptionally tight 21-week programme while operating in the heart of Heathrow’s live airside environment.
The Challenge
Heathrow required a large-scale baggage handling facility capable of processing hold baggage while operating adjacent to active aircraft stands and passenger link bridges.
Key challenges included:
- Construction within a live operational airside environment
- Proximity to four Code F aircraft stands
- Requirement for two Standard 3 baggage screening lines
- Extremely compressed 21-week programme
The ACS Solution and Delivery
The Solution
ACS utilised its modular BaggageBoX system, enabling baggage handling systems to be manufactured, tested and commissioned off-site. This allowed complex system integration to be completed prior to installation.
Delivery
By combining modular building systems with off-site baggage handling system integration, ACS reduced the design and manufacturing programme significantly. The facility was delivered eight days ahead of programme.
Outcome
The project demonstrated a new approach to airport infrastructure delivery at Heathrow, showing how modular construction and off-site integration can accelerate delivery, reduce disruption, and improve programme certainty in a live airside environment.
Key outcomes included:
- Major baggage screening capacity upgrade
- Delivery within a highly compressed programme
- Reduced cost compared with traditional construction
- One of Heathrow’s most successful project delivery examples
Key Project Facts
Facility Size
120m x 40m
Delivery
Modular BaggageBox system
Systems
2 Standard 3 hold baggage screening lines
Location
Heathrow Airport
Time Scale
21 weeks
Scope
RIBA Stage 2–6 delivery
What Our Clients Say
Transform Your Airport Infrastructure
Let ACS build what’s next.
Partner with ACS Modular for faster, smarter delivery without compromise.
Get in touch and accelerate your project today.
">